Company’s Capabilities in HSE MANAGEMENT:
- IOOC / IRITEC / Design and Construction Management Company (DCMC)
Quantitative Risk Assessment and Management– Kharg NGL Project Storage Area
2012
- IOOC/Saied Sanat Maron Company
HAZID Study of Iran Qeshm Oil Production Unit |Extension
2012
- IOOC / IRITEC / Farab-Nardis Consortium
Quantitative Risk Assessment and Reliability Analysis – Kharg NGL Project Utility Area
2011 -2012
- Pasargad Oil Company (POC)
MC Services (HSE) – Abadan Bitumen Production Plant
2010 -2012
- Bayazian Industrial Group
Fire Risk Identification and Assessment for Plastic Films Production Plant
2011
- Combined Engineering & Integrated Solutions (CEIS)
HAZID Study for Latif Flow line & Reception Facility at Sawan Central Processing Plant Project
2011
- Iran Central Oil Fields Company (ICOFC) / Tehran Raymand Consulting Engineers
HAZID Study on Tange-e-Bijar & Kamankuh Gas Field
2011
- IGEDC / Pars Engineering Company
HAZID Study –IGAT VI Khoormouj and Deylam Compressor Stations
2011
- Iran Central Oil Fields Company (ICOFC) / Farab-Nardis Consortium
Environmental Impact Assessment – Varavi Development Project
2011
Risk Management Decision Support Studies -Shurijeh Gas Storage Project
2011
- IOOC / Iran International Engineering Co. (IRITEC)
HAZID Study – Kharg NGL Project
2010 -2011
- China Sichuan Petroleum (CSP) – China National Petroleum Corporation (CNPC)
Hazard Identification Studies -Masjid-i-Suleyman Field Development Project
2010
- Shargan Consulting Engineers-Pasargad Oil Company (POC)
HAZID Study in Bandar Imam Bitumen Export/Import Terminal
2010
Risk Assessment & Management Services -Dorood III Compressor Station
2010
- Pasargad Oil Company (POC)
MC Services (HSE) – Mahshahr Bitumen Export Terminal
2010
- Iran Offshore Oil Company (IOOC)
HAZID Study of Hengam Field Early Production Project
2010
- Pasargad Oil Company (POC)
Risk Management and Contractors' HSE Management System Development
2009 -2010
- NISOC (National Iranian South Oil Company)
Risk Assessment and Management -Karun-Ahwaz Pipeline Corridor
2009
- Iran Central Oil Fields Company (ICOFC)
Environmental Impact Assessment –Dehloran Development Project
2009
HAZID Study for Lavan Island Power Plants Fuel Supply Project
2008
- Aria Pishro Gharn and Rangin Caman Engineering Office
Safety Detailed Engineering -Rangin Caman (Chemicals Manufacturing)
2008
- Qeshm Island Oil and Gas Investment Company (affiliated to Oil Industry Investment Company) – MEP – Rastar Farayand
Bandar Abbas Refinery Feed Supply Pipeline and Single Point Mooring (SPM) Project
2008
- POGC - SLT Engineering (SLTE) International – Rastar Farayand
Detail Engineering -South Pars Phases 15 & 16 -Offshore Platforms
2007
- IOOC - Darya Sahel Company
HAZID Study of Siri Platforms Renovation Project
2007
- Parsikan Iran Consulting Eng. (on behalf of PEDEC)
Mansuri Oilfield Development Studies -Phase 1 - Temporary Facilities
2004
- Namvaran Consultants (on behalf of PEDEC)
Mansuri Oilfield Development Studies -Phase 2 - New Facilities
2004